Our Services
What we Do Best
Perform: cost analysis
Evaluate: capital expenditure projects
Reduce: Inventory costs
Generate: product profitability studies
Develop: detailed Excel schedules
Specialties
We Can Do it All
We offer a range of services designed to improve your financial performance, including cost analysis, investment project evaluation, and productivity improvement strategies using advanced Excel techniques.
Reduce
Production costs
Visualize and Analyze
Beyond the initial costs of production and capital projects
Reduce
The number and frequency of product recalls
Improve
Operating and capital budgeting systems
REDUCE & ELIMINATE
SUPPLY CHAIN COSTS & DISRUPTIONS
Process
Try Our Trademarked Process
Perform
Accurate and thorough cost analysis with superior Excel skills
Evaluate
Accurate and thorough capital evaluation projects with superior Excel skills
Finish
Projects ahead of schedule with excellent organizational skills
Clients
Trusted by Top Companies Around the Globe
Edward Adler has received excellent evaluations for his work in financial and cost analysis, capital expenditure projects, and Excel schedules for the past forty-five (45) years
Corporations that Edward Adler (EA) has posted success
Bristol-Myers: audit work for subsidiaries in Europe and Latin America had all general managers and chief financial officers (CFO’s) requesting that EA return to perform additional and strategic assignments.
Ingersoll-Rand: financial and operational analysis for the Mexican subsidiary led to request for EA to perform assignments for eight (8) to nine (9) months for the next five (5) years.
Nabisco: EA evaluated many capital expenditure projects including production facilities in Barquisimeto, Venezuela, and Celaya, Mexico with superior results.
- Australian candy production line extension
- French packaging line for cakes
Continental Insurance: EA created both Lotus 1-2-3, and Excel schedules that were extremely accurate, and thorough, and ahead of schedule by weeks, and months.
Novartis: EA Performed a capital expenditure evaluation of a packaging savings project for the Theragran Vitamins blister pack.
- Evaluation generated an ROI of 45%, and an NPV of $3,000,000
- Identified an increase in packaging material savings by 40% over a ten (10) year duration
- Ascertained a capital project to reformulate Tavist-D tablets and caplets
Identified obscured production and working capital costs
Performed post audit of capital project. - Enhanced appraisal resulted in an increase of ROI of 10%, and NPV of 15%
Schering-Plough: Analyzed a capital project involving a research facility in Switzerland.
- This appraisal not only more accurately defined ROI and NPV, but also reduced costs by more than $2 million.
ABB Turbocharger:
- Appraised costs of repair and maintenance of pumps and compressors
- Identified and accurately defined labor and material variance between actual and estimated costs
Sanofi-Aventis: identified and rectified cost overruns of research projects
- Identified and rectified cost overruns of research projects
- Evaluated pharmaceutical research cycles and systems
Middle Atlantic Products:
- Reconciled actual hours between production and payroll for each manufacturing division through creation of weekly analysis.
- Identified direct and indirect labor hours for each division
- Reduced number of direct and indirect labor hours for each manufacturing division
- Reconciled actual and standard hours for each product division which reduced labor costs by 25%
- Analyzed and audited setup costs for production line of Light Assembly Division which reduced setup costs by 40%
General Motors:
- Evaluated investment potential for robotics projects, which increased labor savings, reduced costs and increased Return on Investment (ROI) by 40% and Net Present Value (NPV) of $5,000,000.
- Project improved productivity within certain zones of the cab shop (where vehicle framework is assembled) by 50%
- Analyzed the utilization, productivity, and profitability of deploying additional robots throughout the entire plant
- Developed and authored capital expenditures evaluation system for the Linden, NJ facility that produces Chevrolet pickup trucks (Silverado) and Chevrolet sport utility vehicles (Blazer and Trail Blazer).
- Analyzed labor costs for entire Cab Shop Division which resulted in cost reductions ranging from 10% to 50%
- Developed process costing by zone within the Cab Shop Area: obtained completion percentage for work in process (WIP) amounts.
- Performed Non-Scheduled Overtime analysis which resulted in a reduction of overtime ranging from 10% to 50% for various zones in the Cab Shop department.
From Our Founder
Make Your Own Opportunities
Seize control of your financial future with our expert consulting.
We empower you to identify opportunities, optimize operations, and drive sustainable growth through strategic financial management.