Our Services

What we Do Best

 

Perform:  cost analysis

Evaluate:  capital expenditure projects

Reduce:  Inventory costs

Generate:  product profitability studies

Develop:  detailed Excel schedules

Specialties

We Can Do it All

We offer a range of services designed to improve your financial performance, including cost analysis, investment project evaluation, and productivity improvement strategies using advanced Excel techniques.

Reduce

Production costs

Visualize and Analyze

Beyond the initial costs of production and capital projects

Reduce

The number and frequency of product recalls

Improve

Operating and capital budgeting systems

REDUCE & ELIMINATE

SUPPLY CHAIN COSTS & DISRUPTIONS

Process

Try Our Trademarked Process

Perform

Accurate and thorough cost analysis with superior Excel skills

Evaluate

Accurate and thorough capital evaluation projects with superior Excel skills

Finish

Projects ahead of schedule with excellent organizational skills

Clients

Trusted by Top Companies Around the Globe

Edward Adler has received excellent evaluations for his work in financial and cost analysis, capital expenditure projects, and Excel schedules for the past forty-five (45) years

Corporations that Edward Adler (EA) has posted success

Bristol-Myers:  audit work for subsidiaries in Europe and Latin America had all general managers and chief financial officers (CFO’s) requesting that EA return to perform additional and strategic assignments.

Ingersoll-Rand:  financial and operational analysis for the Mexican subsidiary led to request for EA to perform assignments for eight (8) to nine (9) months for the next five (5) years.

Nabisco:  EA evaluated many capital expenditure projects including production facilities in Barquisimeto, Venezuela, and Celaya, Mexico with superior results.

  • Australian candy production line extension
  • French packaging line for cakes

Continental Insurance:  EA created both Lotus 1-2-3, and Excel schedules that were extremely accurate, and thorough, and ahead of schedule by weeks, and months.

Novartis:  EA Performed a capital expenditure evaluation of a packaging savings project for the Theragran Vitamins blister pack.

  • Evaluation generated an ROI of 45%, and an NPV of $3,000,000
  • Identified an increase in packaging material savings by 40% over a ten (10) year duration
  • Ascertained a capital project to reformulate Tavist-D tablets and caplets
    Identified obscured production and working capital costs
    Performed post audit of capital project.
  • Enhanced appraisal resulted in an increase of ROI of 10%, and NPV of 15%

Schering-Plough:  Analyzed a capital project involving a research facility in Switzerland.

  • This appraisal not only more accurately defined ROI and NPV, but also reduced costs by more than $2 million.

ABB Turbocharger:

  • Appraised costs of repair and maintenance of pumps and compressors
  • Identified and accurately defined labor and material variance between actual and estimated costs

Sanofi-Aventis:  identified and rectified cost overruns of research projects

  • Identified and rectified cost overruns of research projects
  • Evaluated pharmaceutical research cycles and systems

Middle Atlantic Products:

  • Reconciled actual hours between production and payroll for each manufacturing division through creation of weekly analysis.
  • Identified direct and indirect labor hours for each division
  • Reduced number of direct and indirect labor hours for each manufacturing division
  • Reconciled actual and standard hours for each product division which reduced labor costs by 25%
  • Analyzed and audited setup costs for production line of Light Assembly Division which reduced setup costs by 40%

General Motors:

  • Evaluated investment potential for robotics projects, which increased labor savings, reduced costs and increased Return on Investment (ROI) by 40% and Net Present Value (NPV) of $5,000,000.
  • Project improved productivity within certain zones of the cab shop (where vehicle framework is assembled) by 50%
  • Analyzed the utilization, productivity, and profitability of deploying additional robots throughout the entire plant
  • Developed and authored capital expenditures evaluation system for the Linden, NJ facility that produces Chevrolet pickup trucks (Silverado) and Chevrolet sport utility vehicles (Blazer and Trail Blazer).
  • Analyzed labor costs for entire Cab Shop Division which resulted in cost reductions ranging from 10% to 50%
  • Developed process costing by zone within the Cab Shop Area:  obtained completion percentage for work in process (WIP) amounts.
  • Performed Non-Scheduled Overtime analysis which resulted in a reduction of overtime ranging from 10% to 50% for various zones in the Cab Shop department.

    From Our Founder

    Make Your Own Opportunities

    Seize control of your financial future with our expert consulting.

    We empower you to identify opportunities, optimize operations, and drive sustainable growth through strategic financial management.